Atlas has maintained a continuous presence at the Port of Oakland since 1987. Working on major harbor renovations, such as the Vision 2000 Plan, as well as a major upgrade and expansion to Oakland International Airport, Atlas has provided a wide range of inspection services. Atlas works closely with the Port Construction Staff on developing and tracking budgets and real-time reporting.
- 105,000 tons of asphalt placed and tested over a 5-day period.
- Full-time quality control staff onsite during Oakland Airport “Hockey Stick” expansion.
- Staff augmentation to facilitate resident engineers.
- Detailed reporting to assure FAA compliance.
DURATION: 1987 – ONGOING
CONSTRUCTION COST: $150 MILLION ANNUALLY DEPENDING ON FUNDING