Across the country, communities are investing in modern water infrastructure that can meet changing regulations, withstand seismic events and support long‑term population growth. A major regional initiative in the Pacific Northwest reflects this movement, leveraging alternative delivery through a Construction Manager/General Contractor (CM/GC) approach to combine advanced treatment technology with seismically resilient pipelines — protecting a critical drinking water supply for generations to come.
At the heart of this program is a new state‑of‑the‑art filtration facility capable of treating 135 million gallons of water per day. Paired with new pipeline infrastructure to replace aging components, the project will remove sediment, organic material, microorganisms and other contaminants, including Cryptosporidium from the city’s drinking water supply.
Supporting Quality, Safety and Reliability Throughout Construction
As an essential partner on this CM/GC-delivered project, Atlas provides comprehensive inspection and quality oversight, spanning grading, concrete, coatings, pipeline installation, electrical systems and mechanical components. This work supports alignment with contractual requirements, regulatory expectations and the rigorous safety standards essential for a project of this scale.
Within the collaborative CM/GC delivery environment, Atlas strengthens coordinated decision‑making by offering clear documentation, real-time communication and multidisciplinary field support. Early contractor involvement enables proactive identification of constructability challenges, informed cost and schedule decisions and effective management—helping maintain compliance with state and federal water regulations while keeping construction moving efficiently.
Protecting Health, the Economy and the Future
This investment in upgraded treatment facilities and resilient conveyance infrastructure delivers benefits that extend far beyond regulatory compliance — protecting public health, supporting economic vitality and enhancing long-term system resilience in the face of seismic risk and future demand.
A Model for Modern Water Delivery
“This project demonstrates the value of alternative delivery, particularly the CM/GC model, in addressing complex water infrastructure challenges,” said Tom Price, Atlas Infrastructure President. “By working collaboratively with the owner, designer and contractor early in the process, our team helps manage risk, maintain consistent quality and adapt as field conditions evolve. Atlas’ integrated role supports informed decision-making and contributes to the long-term reliability of this essential water system.”
Learn more about Atlas’ alternative delivery solutions and connect with us at the annual , being held April 13-15, in Grapevine, Texas. Visit us in Booth #638.
